At present, the demand for stone is increasing, so how much does it cost to invest in a stone plant? This article will introduce to the users who are going to invest in the stone plant what aspects are involved in the budget.

Preliminary preparation for investment in stone works

1. Apply for permit

Investment in a stone plant is becoming more and more formal. It is necessary to prepare business license, mining license and safety production license. These very important certificates need to be provided, but some administrative expenses need to be prepared in the early stage.

2. Site cost

To invest in a quarry, it is necessary to have a production and processing site, lease the production site, or purchase it. It needs to be determined according to the actual situation and market conditions. Users need to consult with the local relevant departments before they can do so.

Medium term preparation for investment in stone works

(1) Investment in equipment

A. In mining, the equipment needed to be prepared includes: rock drill, drill, air cannon and other blasting equipment.

B. The transportation means needed for mining include: forklift, excavator, loader, etc.

C. Complete set of equipment for stone production line: the tools to be prepared in the early stage of stone processing include feeder, crushing equipment (jaw crusher, impact crusher, cone crusher, etc., and the appropriate type is selected according to the actual demand), vibrating screen, conveyor and other equipment. In addition, according to the user's requirements for the finished products, sand machine, sand washing machine and other equipment can be equipped.

D. The components needed for the whole system in the stone production line include motor, starting cabinet, transformer, cable and air compressor.

(2) Investment of civil engineering cost

With the stone plant increasingly moving towards the environmental protection route, the requirements for the construction of stone production site are higher and higher. Large stone plants generally need to do some dust removal facilities. For the construction of the factory building, the closed shed production mode is adopted, and steel structure is required. This part of the investment also needs a certain capital budget.

(3) Environmental protection cost

At present, environmental protection is a necessary project for stone production, which can only be operated normally after reaching the standard. Specific environmental protection measures include installation of dust removal facilities, sealing facilities, greening of surrounding environment, etc. it is recommended that users choose energy-saving and environmental protection stone crushing and processing equipment.

Later investment budget of stone plant

1. Cost investment budget of materials

If the stone site is remote and inconvenient for transportation, transportation cost should be considered.

2. Labor cost

In the process of stone processing and production, labor and equipment are needed. If the quality and skills of the selected equipment are good, on-site operators can be reduced. Over the course of a year, it can help users save more than 100000 or even hundreds of thousands of labor investment, but the necessary post personnel are still needed.

As a supplier with nearly 30 years' manufacturing, Shuguang Heavy Machinery produces and sells jaw crushers,hammer crushers, impact crushers, vertical shaft crushers, cone crushers, compound crushers, Raymond mills, high pressure mills. Powder machine, vertical mill, ultra-fine grinding machine, ball mill, double-shaft shredder and other heavy equipment crusher. Feel free to contact us for more details.

Factory Address: Longjiang West Road, Shangjie District, Zhengzhou City

Contact number: +86-371-67666660 676667

Mobile phone: 0086 13523465141

After-sales Service Department: 0371-67666667

Contact
Zhengzhou Shuguang Heavy Machinery Co., Ltd.

TEL:0086-13523465141

0086-371-67666660

FAX:0086-371—68125111

Email:shuguang_mill@163.com

Address:No.104,Gongye west road,Shangjie district,Zhengzhou City,Henan China