First, calcium carbonate grinding mill installation preparation phase, need to prepare the plant, power supply.The height and length and width of the plant should leave room for easy maintenance and loading and under material. The factory building should have a cement floor with a thickness of about 10 cm. It is not required to cover all the plants with a thickness of about 10 cm. Simply put the main body of the grinding mill and the fan position into 9 cm thick cement. Other parts can be around 6 cm. To be ready to use the installed tools, general general tools can be solved, such as more than two wrenches, wiring clamps, crowbars, etc.

Second, calcium carbonate grinding mill installation stage, the main work of the installation phase is to place the grinding mill mainframe in a predetermined position, place a rubber pad underneath, and install expansion bolts on the concrete floor. After the host is installed, the host and the fan are connected. The fan and the tee are connected by bolts, and the main unit and the tee are connected by soft. Then place the cyclone and the precipitator at the pre-determined location, then connect the remaining pipes. Pay attention to the seal of the pipe when connecting the pipes to prevent air leakage. After the grinding mill pipe connection is completed, the wiring is completed, and the lines of the three motors are connected, and the installation phase is completed.

E-mail : shuguangzhongji@163.com

Cel : 0086-13523465141

Contact
Zhengzhou Shuguang Heavy Machinery Co., Ltd.

TEL:0086-13523465141

0086-371-67666660

FAX:0086-371—68125111

Email:shuguang_mill@163.com

Address:No.104,Gongye west road,Shangjie district,Zhengzhou City,Henan China